Propane Fire Pit Main Control Brass Safety Valve Kit,Heater Pilot Burner Assembly ReplaceParts include Valve Kit, Connecting tubes,Tilt switch and Safety Device Ignition Component Pilot Kit - METER STAR

Propane Fire Pit Main Control Brass Safety Valve Kit,Heater Pilot Burner Assembly ReplaceParts include Valve Kit, Connecting tubes,Tilt switch and Safety Device Ignition Component Pilot Kit

货号 MSGAS-FM009F-ODS006A-XN019A-KG002-HO003B 产品编码 709226204598
选项 VALVE & Aluminum Tube KIT
  • Pilot thread is M8*1 for copper tube,Wire length: 9.84inch on pilot burner & 7.87in for spare wire,Terminal: Flat 4.8mm universal
  • Highlights
  • Patio Heaters THP-ATM Anti Tilt Switch for Patio Heater,FD4 Dump Switch 250VAC 15A,125VAC 20A T125
  • The entire kit is easy to replace and solves various problems at once.After the valve is installed as a whole, it is necessary to test whether each part is connected tightly.
  • When connecting the aluminum pipe, the sealing rings in the kit must be used at both ends to avoid the risk of gas leakage.

产品详情

Highlights
- Pilot thread is M8*1 for copper tube,Wire length: 9.84inch on pilot burner & 7.87in for spare wire,Terminal: Flat 4.8mm universal
- Inlet valve thread M10*1, outlet thread 7/16"-24 UNS, Pilot thread M8*1,Please refer to the example picture for the appropriate assembly and installation. Copper sealing rings need to be placed at both ends of the aluminum tube, and nuts and caps need to be used to fasten them to the valve and the pilot light respectively. If you are not sure, please consult customer service.
- Pilot thread is M8*1 for copper tube,Wire length: 9.84inch on pilot burner & 7.87in for spare wire,Terminal: Flat 4.8mm universal
- 2 pc 4mm Sealing rings,1 x 4mm aluminum tube 39.5 inches, 1 x internal thread M8*1 set of 4MM pipe, 1 x external thread M8*1 set of 4MM pipe Diameter of the aluminum tube is 0.16“(4mm),Valve Pilot Burner Tube Pipe Assembly,Gas Pilot Tubing
- Patio Heaters THP-ATM Anti Tilt Switch for Patio Heater,FD4 Dump Switch 250VAC 15A,125VAC 20A T125
- The entire kit is easy to replace and solves various problems at once.After the valve is installed as a whole, it is necessary to test whether each part is connected tightly.
- Special Reminder: When installing the aluminum tube to connect the valve and the constant open flame, first check whether the two ends of the aluminum tube are blocked. If you need to cut the aluminum tube, please use professional tube cutting equipment (do not use scissors and cutting machines). You can coil the overlong aluminum tube for storage. Be careful not to flatten the aluminum tube, and do not force it when bending it. Please assemble and install the valve kit according to the installation diagram shown on the web page.
- When connecting the aluminum pipe, the sealing rings in the kit must be used at both ends to avoid the risk of gas leakage.

Valve replacement as a whole set, complete with various accessories

常见问题

如何确认兼容性?

请对比产品页面上显示的商品编号、产品图片、尺寸、变体选项和型号信息。如果该零件用于燃气、加热、电气或安全相关设备,请在下单前联系我们。

你们支持批量采购吗?

欢迎小批量批发咨询。请发送商品编号、数量、目的地国家以及任何包装或配送要求,我们将审核库存并提供实际报价。